Your project scope
Gather building plans, current installation records, usage requirements and a clear list of interfaces between the technical packages.
Start with the site, its uses and existing installations. Available drawings, equipment references, operating hours and constraints help prepare the study and any necessary site visit.
The proposal defines the equipment, services, interfaces and boundaries of the technical package. Installation, commissioning checks and handover documents are specified for the agreed scope.
For a multi-system project, the interfaces between power, networks, water, ventilation and control systems are reviewed together. Access for servicing and the maintenance scope are considered from the design phase.
